Difference between revisions of "Current Run"
From Jackpoint
m |
|||
(3 intermediate revisions by 2 users not shown) | |||
Line 3: | Line 3: | ||
== GAS == | == GAS == | ||
10 Secrets | 10 Secrets | ||
+ | 5 Assets | ||
== Expenses == | == Expenses == | ||
4000¥ - Hiring someone to case the joint. Report: [[Urban Renewal HQ Casing Report]] | 4000¥ - Hiring someone to case the joint. Report: [[Urban Renewal HQ Casing Report]] | ||
+ | |||
+ | === Highest opposed pool === | ||
+ | 24 | ||
+ | |||
+ | === Extras === | ||
+ | |||
+ | A bunch of information on Urban Renewal plans | ||
+ | |||
+ | * Site B01463 is confirmed to be in the Redmond-like zone next to on the other side of the river to the St. Louis arcology. It seems to be an extensive underground facility and is most likely to be a black site. |
Latest revision as of 22:00, 17 August 2024
Black Star has intercepted a message from Lyndon Adams in a dead drop and wants the team to foil it. Suspiciously Urban Renewal Department was awarded the contract to redevelop St. Louis.
GAS
10 Secrets 5 Assets
Expenses
4000¥ - Hiring someone to case the joint. Report: Urban Renewal HQ Casing Report
Highest opposed pool
24
Extras
A bunch of information on Urban Renewal plans
- Site B01463 is confirmed to be in the Redmond-like zone next to on the other side of the river to the St. Louis arcology. It seems to be an extensive underground facility and is most likely to be a black site.