Difference between revisions of "Current Run"

From Jackpoint
 
(One intermediate revision by one other user not shown)
Line 14: Line 14:
  
 
A bunch of information on Urban Renewal plans
 
A bunch of information on Urban Renewal plans
 +
 +
* Site B01463 is confirmed to be in the Redmond-like zone next to on the other side of the river to the St. Louis arcology. It seems to be an extensive underground facility and is most likely to be a black site.
 +
 +
== Rewards ==
 +
{{RunRewardsBreakdown
 +
|challenge=24
 +
|objectives=all
 +
|behaviour=karma
 +
|negotiation=0
 +
|relative_nuyen_adjustment=0
 +
|absolute_nuyen_adjustment=+40333
 +
|karma_per_session=2
 +
|sessions=4
 +
}}

Latest revision as of 23:44, 28 September 2024

Black Star has intercepted a message from Lyndon Adams in a dead drop and wants the team to foil it. Suspiciously Urban Renewal Department was awarded the contract to redevelop St. Louis.

GAS

10 Secrets 5 Assets

Expenses

4000¥ - Hiring someone to case the joint. Report: Urban Renewal HQ Casing Report

Highest opposed pool

24

Extras

A bunch of information on Urban Renewal plans

  • Site B01463 is confirmed to be in the Redmond-like zone next to on the other side of the river to the St. Louis arcology. It seems to be an extensive underground facility and is most likely to be a black site.

Rewards

NuyenKarma
Highest opposed pool24
Factors
(Pool / 4)6
(Pool / 6)4
Survived+2
Objectives: all +2
Subtotal

¥18000

8

Good feelings

¥14400

10

Double

¥28800

20

Negotiation
0 hits:¥28800

20

Relative Nuyen Adjustment
0:¥0

20

Absolute Nuyen Adjustment
+40333:¥40333

20

Session Karma ¥40333
Karma per session: 2# of sessions: 4
 8
Final

¥40333

28